Bathroom Remodeling in Van Nuys

Van Nuys bathroom remodels that keep water out of the walls and floor: sloped pans, tested membranes, sealed corners and a fan that vents outside.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Water in a Van Nuys bathroom gets three places to go: down the drain, out through the fan or into the walls. Good building makes the first two easy and shuts off the third. The shower pan is sloped toward the drain, a membrane wraps the wet surfaces, and a duct carries steam to the outdoors. Each of those parts is checked while it is still visible.

Sending water where it belongs

A shower floor needs a gentle fall to the drain, and tile alone cannot supply it. A mortar bed is shaped first, covered with a sheet membrane, and the membrane climbs the walls above the showerhead. The curb or the threshold is sealed on all sides. Valve and shower arm penetrations get their own collars, since small holes cause most leaks. After that, the entire pan is flooded and watched. The result is a floor that sheds water and walls that stay dry behind the tile.

Steam and the rest of the room

A fan sized for the room and ducted to the exterior carries humidity out of the building, where an attic duct would leave it in the roof. Paint rated for damp rooms and a tight door sweep help the rest. For a rebuilt house, the vent run is drawn with the roof framing, so the duct has a straight path and a proper cap. Running it later through finished ceilings is harder than drawing it in. Paint on the ceiling is a moisture-rated product, which resists the mildew that steam invites.

About our Bathroom Remodeling serviceEverything we build in Van Nuys

Bathroom Remodeling in Van Nuys: questions

Bathroom Remodeling in other cities

What are you building in Van Nuys?

Tell us about the property and what you have in mind. We reply with a written next step.