Room Additions and Second Stories in Van Nuys

Room additions and second stories in Van Nuys, with moisture control under the floor and roof drainage worked out before the first footing is dug.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Moisture rises from the ground as well as falling from the sky, and the floor of a new Van Nuys room has to answer to both. A vapor barrier under the slab or a covered ground surface in the crawl space keeps soil moisture away from the flooring above. Over a rebuilt foundation or a new addition footing, the barrier goes in before concrete or framing buries it for good.

Under the floor

A new slab sits on compacted fill with a layer of gravel and a vapor retarder between the soil and the concrete. The retarder joints are lapped and taped, and the edges turn up at the footing so moisture cannot creep around them. If the addition has a raised floor, the crawl space gets a ground cover and ventilation openings sized to code. Plumbing penetrations through the barrier are wrapped before the pour. Those steps are inspected before concrete arrives, because afterward nobody can see them.

Where roof water ends up

The new roof adds area, and every added square foot sends water somewhere. Gutters collect it, leaders carry it down, and the outlets discharge away from the foundation. On a flat lot, a buried drain line may be needed to move that water off the site, so the line is planned with the footing layout. Where a neighboring lot sits close, the discharge is aimed within the property line. Downspout locations are marked on the plans so the roofer and the grader work from one drawing.

About our Room Additions serviceEverything we build in Van Nuys

Room Additions in Van Nuys: questions

Room Additions in other cities

What are you building in Van Nuys?

Tell us about the property and what you have in mind. We reply with a written next step.