Bathroom remodeling built to last

A bath is mostly hidden work: the waterproofing, the drain slope, the vent fan. We get those right first, then make the room look the way you want.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Planning a bath in a new house

When a house is rebuilt, the bathrooms can be laid out from scratch: a curbless shower, a wider door, blocking in the walls for grab bars later. Adding these on paper costs very little, so we ask about them before the plans are final.

Waterproofing comes first

Tile is not waterproof on its own. Under it goes a membrane that wraps the shower walls and floor and runs to the drain. We install it, test it with water before tile goes on, and only then set the finish.

Air, light and fixtures

An exhaust fan matched to the room and vented to the outside keeps moisture out of the walls. We plan the lighting, the outlets and the fixture locations together, so the vanity, mirror and shower valve all land where you want them.

Bathroom Remodeling: questions

Plan your bathroom

Tell us which bathroom and what you want changed. We set up a visit to measure and look behind the tile.