ADU Construction in Van Nuys, From the Roof Membrane Down

Van Nuys ADU construction on a fire rebuild lot: a low-slope membrane roof with scuppers and overflow, LADBS plan review, and an inspected build to final.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

A low-slope roof keeps a Van Nuys ADU low and simple to frame, and it changes how rain leaves the building. Water runs across a single-ply membrane toward scuppers cut through a short parapet, then drops through a collector box into downspouts. Tapered insulation under the membrane builds in the fall, so no puddle stands for long. Where fire has cleared the lot, we draw this roof before the walls, because its drains set where the downspouts land.

Scuppers, overflow and the membrane

Because a parapet can hold water back, the code asks for a second way off the roof. An overflow scupper sits a little higher than the main one, so it only runs if leaves or debris block the first, and its outlet is placed where you can see it working. Crickets, small sloped saddles cut from insulation board, push water around the corners toward each scupper. The membrane is a white or light gray sheet with heat-welded seams, turned up the inside of the parapet and over its top under a metal cap. Every seam is probed before the roof inspection.

Anything that sits on the roof

A low-slope roof is a natural place for solar panels and sometimes for a heat pump condenser, and every bracket or curb that passes through the membrane is a spot water could follow. We set equipment on raised curbs flashed into the membrane, use attachments made for single-ply roofs, and lay walk pads along the route a technician will take. All of it goes on the drawings for the LADBS reviewer, and the roof is inspected before panels or equipment cover it. Placing those penetrations now keeps the membrane whole when more equipment arrives with the main house.

About our ADU Construction serviceEverything we build in Van Nuys

ADU Construction in Van Nuys: questions

Plan your project in Van Nuys

Tell us about the property and what you have in mind. We reply with a written next step.