Van Nuys Structural Work at the Eaves and Roof Joints

Rafter tails, fascia, kickout flashing and gutters: Van Nuys structural work at the roof edge that keeps roof water out of the frame after a fire.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Roof water does much of its harm where the roof meets a wall. In a Van Nuys house being repaired after a fire, we look closely at those joints: the eaves, the rafter tails that form them, and any spot where a lower roof runs into a taller wall. A missing drip edge or a gap in the flashing lets water soak the rafter ends and the top of the wall out of sight, until the wood gives way.

Rafter tails, fascia and the drip edge

Rafter tails are the ends of the rafters that reach past the wall to form the eave. When they rot or char, the engineer may allow new tails sistered alongside or call for replacement back to the wall, with blocking between each pair. The fascia board is renewed on sound wood, and a metal drip edge goes under the roofing so water leaves the roof clear of the fascia. Gutters hung along that new edge carry the water to downspouts and on to outlets set well away from the walls.

Where a low roof meets a tall wall

Where a lower roof ends against the wall of a taller part of the house, rain running down the roof meets the wall and can slip behind the siding. A kickout flashing at the bottom of that joint turns the water out into the gutter, and step flashing along the joint keeps it out of the wall above the roofline. Where siding came off for the fire repair, new building paper laps over these flashings so water stays outside. Repairs to rafters, plates and wall framing are permitted through LADBS and inspected before roofing and siding go back on.

About our Structural Work serviceEverything we build in Van Nuys

Structural Work in Van Nuys: questions

Plan your project in Van Nuys

Tell us about the property and what you have in mind. We reply with a written next step.