Commercial construction and rebuilds

Small commercial buildings lost or damaged by fire need the same ordered path as a house: assessment, scope, engineering, permits and a staged build.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Rebuilding a commercial property

A damaged storefront, office or mixed-use building raises the same first questions as a house: what can be reused, what the code now requires and what the policy covers. We assess the building, write the scope and coordinate the engineering and permits.

Ground-up shells

For a new building, we manage the site work, foundation, structure, roof and exterior to a weathertight shell, ready for tenants or for the owner's interior. Each stage is inspected before the next one starts.

Working to commercial code

Commercial work brings accessibility, fire separation and occupancy requirements a house does not have. We make sure the drawings address them before submission, so plan check is a review and not a redesign.

Commercial Construction: questions

Talk through the building

Send the address and what the building needs. We reply with the next step.