Flooring and drywall installation

The two finishes that make a framed house feel like a home. We hang, tape and finish the walls, then lay floors that suit the room and the subfloor.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Drywall in a rebuilt house

After framing, insulation and inspection, drywall closes the house in. We hang it, tape and mud the joints, and finish to the level of smoothness the paint and light will demand. Fire-rated board goes where the code calls for it, such as the garage wall shared with the house.

Floors start with what is underneath

A floor is only as flat as its subfloor. We check it, level what needs leveling and install the right underlayment for the material you choose: hardwood, engineered wood, tile or luxury vinyl plank. Then the boards or tiles go down, with transitions planned between rooms.

Repairs after smoke or water

In a damaged house, wet or smoke-soaked drywall and flooring often have to come out. We remove it, let the framing dry and get checked, and replace the finishes so they match the rooms that were spared.

Flooring, Drywall & Interior Finishes: questions

Get a measure and written quote

Tell us the rooms and what you want on the floors and walls. We set up a time to measure.