Everything a rebuilt home needs
Fifteen services, led by fire rebuilds, new construction and structural work. One builder, one written scope and one schedule from the foundation up.
Rebuild from the ground
The structural work of starting over: rebuilding after a fire, building new on a cleared lot, repairing what the frame needs, and adding an ADU or more living space.

Fire Rebuild & Reconstruction
From the slab to move-in: assessment, scope, engineering, permits and the full rebuild.See the service
New Construction
A new house on your lot, from survey and plans to the final inspection.See the service
Structural Work
Foundations, framing, beams and shear walls, repaired or rebuilt to an engineer's plan.See the service
ADU Construction
Backyard units and garage conversions, from the plans package through the build.See the service
Room Additions
Room additions and second stories, engineered and permitted before the first footing.See the service
Rooms and finishes
The interior stages that turn a framed shell into a home, or update a house that is still standing: full remodels, kitchens, baths, flooring and drywall.

Full Home Remodeling
A full remodel planned as one project, from opened walls to final finishes.See the service
Kitchen Remodeling
New or rebuilt kitchens: layout, cabinets, counters and the systems behind them.See the service
Bathroom Remodeling
Bathrooms with sound waterproofing, good ventilation and fixtures you chose.See the service
Flooring, Drywall & Interior Finishes
Walls hung and finished, floors laid flat and true on a sound subfloor.See the service
Shell and outdoor
The skin of the house and the space around it: stucco and siding, windows and doors, decks and patios, chosen to suit the fire rules for your lot.

Stucco & Exterior
Stucco and siding for new and repaired walls, with ignition resistance where the lot needs it.See the service
Windows & Doors
New and replacement windows and doors, specified for the fire rules on your lot.See the service
Decks & Patios
Decks and patios on sound footings, with surfaces chosen for the fire rules.See the service
Commercial work
Shell construction, tenant improvements and office or retail renovation, run with the same written scope and inspection discipline as our homes.

Commercial Construction
Ground-up commercial shells and rebuilds of damaged commercial buildings.See the service
Tenant Improvements
Interior build-outs for offices and storefronts, from framing to final inspection.See the service
Office & Retail Renovation
Renovations of working offices and shops, phased to limit downtime.See the service
Not sure which service fits?
Tell us what happened to the property and what you hope to end up with. We sort it into stages and tell you where to begin.

