Full Home Remodeling in Van Nuys
Whole-house remodeling in Van Nuys with water kept out while walls are open and led away from the framing once the new work is closed up.
A house with its walls open has no defense against a hard storm, so a Van Nuys remodel starts with temporary covers, wrapped openings and a path for runoff. Once the new work is closed up, flashing, grading and drainage take over the job and keep water moving away from the framing. Each step is listed in the written scope.
Keeping water out while open
Temporary roof covers go on before demolition reaches the ceilings. Window and door openings that lose their frames are closed with sheathing and house wrap, and the wrap is lapped so water runs down and over each layer. Floors are protected with sheeting taped at the edges. After a rain, we look for damp spots in the framing before the next stage begins, because wet lumber covered with drywall grows problems that take months to show. Sump or pump gear is staged on site whenever a low spot collects runoff.
Sending water away afterward
The finished house sheds water in layers. Roof flashing is renewed at valleys, chimneys and wall joints that are exposed, new window flashing is lapped into the wrap, and gutters empty well past the foundation line through downspouts and extensions. If the soil beside the foundation slopes toward the house, we regrade it or add a drain, and the fix is listed in the scope as its own item. Inland sun and dry wind age caulk and paint, so exposed joints are detailed to last.
About our Full Home Remodeling serviceEverything we build in Van Nuys
Full Home Remodeling in Van Nuys: questions
Yes, if the framing is sound. Once insulation and drywall are removed, soot-stained studs are cleaned and heat-weakened ones replaced. The roof and exterior get checked at the same time, since a house that was soaked during firefighting needs dry framing before it is covered up again.
Cover and protect, open and repair the structure, run the new systems, close the walls, then finish. Between blocks we check the roof and wall wrap for leaks so water damage cannot hide in a finished room. Each block carries a line in the written scope.
Worn plumbing, wiring near the heat and any duct that carried smoke come first. Roof drains and gutters belong on the list too, because they are easier to replace while ladders and scaffolds are already up and the roof edge is exposed.
Full Home Remodeling in other cities
More we build in Van Nuys
What are you building in Van Nuys?
Tell us about the property and what you have in mind. We reply with a written next step.

