Rebuilding in Van Nuys, Los Angeles County

Fire rebuild in Van Nuys

Van Nuys fire rebuild planned for inland valley conditions: durable exterior finishes, a cooler roof, drainage drawn on the site plan and LADBS permits.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add what you are interested in, your first name and a phone number or an email.

A rebuild on an inland valley lot such as one in Van Nuys is planned for general valley conditions: strong sun, dry wind and the occasional storm that drops heavy rain all at once. We shape the cladding, roof and drainage around those conditions from the first drawing. Each choice is written into your scope beside the stage where it is built, so you can see its cost and its reason.

The outside skin

Sun and dry wind wear on the outside of a house first. Paint fades, sealant joints open, and bare wood trim dries out and splits. We choose a stucco finish coat with the color mixed in, flexible sealant at windows and penetrations, and trim in fiber cement, or in wood sealed on all sides before installation. Wind pushes air through any gap, so window and door openings get flashing tape lapped in order and a continuous air barrier behind the cladding. Light, cool-rated roofing goes on where the design allows, which cuts the heat reaching the attic. Each item is priced as its own line in your scope.

Rain after a long dry spell

Drainage is easy to forget on a lot that may go dry for months, so it goes on the site plan where the plan checker can review it. Gutters collect roof water, and downspouts carry it to a buried line or a splash block that sends it away from the footings. The soil around the house is graded to fall away from the walls, and the slab sits high enough that water cannot reach the siding. LADBS reviews that site plan with the rest of the set. Valley Glen and Lake Balboa share the same valley setting, so a rebuild there gets these heat and drainage details too.

Start your Van Nuys project with a lot visit

Send the address and where things stand. We reply with the next step.