Office & Retail Renovation in Van Nuys

Office and retail renovation in Van Nuys that keeps water in the drains and pipes: moisture tracing, flashed roof penetrations, sill pans and LADBS permits.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Roof drains, supply pipes and fixtures are where water is meant to travel in a Van Nuys shop or office, and a renovation must keep it there. After a nearby fire, firefighting water may already have reached the drywall and insulation, so we start by tracing where it went. A hard storm on an inland roof tests every flashing the work touches, and the plan accounts for that as well.

Tracing water already inside

Moisture readings along the base of walls and around restroom fixtures show where water has settled. Wet drywall is cut back, cavities are dried with fans and dehumidifiers, and framing is checked for rot and mold before anything is closed. Supply and drain lines that a new layout moves are pressure tested before inspection. Restroom floors get a waterproof membrane under tile where the code or the finish calls for one, so a future leak stays on the surface. Shutoff valves are placed where staff can reach them.

The roof and the storefront

Where the renovation adds a rooftop unit, an exhaust fan or a new duct, each penetration is flashed and sealed to the membrane, and the drains are cleared and tested. Storefront frames are set on a sill pan that weeps to the outside, and the paving at the door is checked so it falls away from the threshold. Sealant joints are tooled and left to cure before paint goes over them. These details go on the LADBS permit drawings with the rest of the work, and each is inspected before it is covered.

About our Office & Retail Renovation serviceEverything we build in Van Nuys

Office & Retail Renovation in Van Nuys: questions

Office & Retail Renovation in other cities

What are you building in Van Nuys?

Tell us about the property and what you have in mind. We reply with a written next step.