Home additions and second stories

More room, built onto the house you have or designed into a rebuild. We start with what the structure and the lot will allow.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Growing the house during a rebuild

A rebuild is the cheapest moment to add space, since the foundation and framing are new anyway. A bedroom or a second floor drawn in now is a fraction of the work of adding one to a finished house.

We show what the extra space does to the permit path and the budget, so the decision is made with numbers on the table.

Adding to a standing house

Building onto an existing home means tying new framing into old. We check the foundation and the frame first, because a second story puts real weight on walls and footings that were sized for one. The engineer's plan tells us what has to be reinforced before the addition can start.

Keeping the house usable

We sequence the work so the existing rooms stay protected and, where possible, livable. The roof is opened only when the new framing is ready to close it, and temporary weather protection is part of the scope.

Room Additions: questions

Find out what your lot allows

Send the address and the space you want to add. We reply with what to check first.