Decks, patios and outdoor rooms

Outdoor space is part of a rebuilt home. We frame decks on proper footings, choose surfaces that suit the fire rules, and pour or pave patios that drain away from the house.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Rebuilding the outdoor space

A deck attached to a house is a path for fire to the walls, so in a mapped fire hazard area the decking itself must be ignition-resistant or noncombustible. We bring sample boards that meet the rule, and keep the space beneath the deck clear and easy to maintain.

The parts you never see

Footings sized for the load. Post bases that hold wood off concrete. A ledger bolted to the house framing with flashing above and behind it. Hangers and fasteners suited to the exposure. Those details decide how long a deck lasts, and the inspector checks them before the boards cover them.

Patios and covers

A concrete or paver patio needs a compacted base and a slope that carries water away from the foundation. A patio cover needs footings and a beam sized for its span, and in a fire area, materials chosen to match the house.

Decks & Patios: questions

Plan the outdoor space

Send the rough size and what you want to use it for. We reply with a time to look at the site.