Rebuilding in Marina del Rey, Los Angeles County

Fire rebuild in Marina del Rey

Marina del Rey fire rebuild run in the same stages as Venice, Playa Vista and Culver City, with Los Angeles County reviewing the plans for this community.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add what you are interested in, your first name and a phone number or an email.

Marina del Rey shares its corner of the Westside with Venice, Playa Vista, Mar Vista, Santa Monica, Culver City and Palms, and every rebuild across that group follows one fixed sequence. Assessment and a written scope come first, then engineering, then permits, then construction from the foundation up. The one thing that changes between those places is which agency reviews the plans.

Who reviews which address

Building permits and inspections in Marina del Rey come from Los Angeles County, because the community is unincorporated. Venice, Playa Vista, Mar Vista and Palms belong to the City of Los Angeles and go to LADBS. Santa Monica and Culver City each run their own building departments with their own submittal forms. The drawings, calculations and energy reports are prepared the same way for all of them, and the written scope names the reviewing office at the top, so you know whose corrections to expect and whose inspector will walk the site.

Materials that suit damp air

Moist air speeds up corrosion on any metal left exposed, so the details are chosen with that in mind on every Westside rebuild. Framing connectors, anchor bolts and roof fasteners are specified hot dipped galvanized or stainless. Flashing at windows, doors and the base of each wall is lapped so water drains outward, and stucco or fiber cement siding sits over a drainage gap that lets trapped moisture dry. Windows are chosen with frames that resist pitting. The same specification goes onto the plan set in Marina del Rey and in each of its neighbors.

Start your Marina del Rey project with a lot visit

Send the address and where things stand. We reply with the next step.