Woodland Hills ADUs placed around the new electric service route on a lot cleared by fire, with meter access, inspected trenches and LADBS plan review.
On a Woodland Hills lot where the house burned, the electric service from the street may have to be replaced, and if the new one runs underground, its conduit path limits where an ADU can stand. That conduit needs a clear trench from the utility's connection point to the meter, and no footing can sit on top of it. We trace that route on the cleared lot first, then place the unit so its own feed stays short and reachable.
Meter location and access
The meter has to stay where the utility's crews can reach it without entering a locked yard, and the panel beside it needs clear working space in front. If the ADU gets its own meter, that meter can share a wall or pedestal with the main house meter, and a feeder runs from there to the unit. That puts the unit's feeder trench, and with it the unit's position, in a line from the meter wall. A subpanel inside the ADU then serves its circuits, with its main disconnect where the inspector expects to find it.
Trenches, spacing and inspection
Power, water and drain lines can share a trench only within the limits the codes set for spacing and depth, so we draw each one with its cover and its distance from the others. Conduit under a driveway goes deeper or gets a concrete cap. LADBS inspects the trench open, with the conduit and its warning tape in place, before backfill, and the utility then makes its own connection at the meter. Drawing these routes before the main house is designed keeps its footings off the lines that feed the ADU.
About our ADU Construction serviceEverything we build in Woodland Hills
ADU Construction in Woodland Hills: questions
The city has to agree to occupancy ahead of the house, and with that in place, yes. That order puts the lasting power setup on the lot early, so we design the service for the finished pair of buildings and install the ADU's share of it now. The main house later joins the same meter wall without new digging across the unit's yard.
The package can serve your Woodland Hills lot if the ADU stays a single story with 500 square feet of floor or less, a fit we confirm before you commit. For Woodland Hills, our site plan shows the meter, the conduit route and the trench to the unit, so the reviewer can see the power path clear of every footing.
A garage may be fed by a single small circuit, which falls far short of what a dwelling needs. Converting it means a feeder from the meter, a subpanel and new wiring throughout, along with checks of the slab, the walls and the roof framing. The written quote then sets the conversion against the cost of a new detached unit.