ADU Construction in Canoga Park, Flashed Where Roofs Meet Walls

Canoga Park ADU construction on a fire rebuild lot: kickout and step flashing where roofs meet walls, a Class A roof, LADBS review and inspected stages.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Where a small porch roof meets the wall of a Canoga Park ADU, rain sliding down the roof edge can run straight into the siding unless something turns it. A kickout flashing, a short bent piece of metal at the bottom of that joint, sends the water into the gutter. On a unit built after a fire, we draw every roof-to-wall joint this way, along with the gutter and downspout each one feeds.

Step flashing, valleys and laps

Water on a roof moves downhill over every lap, so each layer is installed to shed onto the one beneath it, starting at the eave. Where a roof slope runs along a wall, step flashing goes in piece by piece with each course of roofing, and the siding laps over it. Valleys get a full-width metal liner under the covering. On a fire rebuild we use a Class A roof covering throughout, and the underlayment is checked before the covering hides it, while the laps can still be seen.

Doors and windows under the roof edge

Water that leaves the roof still reaches the openings beneath it. A door under a porch roof gets a sill pan that catches any leak at the threshold and drains it outward, and a head flashing that turns water away above the frame. Windows get the same treatment, lapped into the weather barrier in the right order. The landing outside the door is poured with a slight fall away from the unit. All of this is drawn for the LADBS reviewer and checked by the inspector while the weather barrier is still exposed.

About our ADU Construction serviceEverything we build in Canoga Park

ADU Construction in Canoga Park: questions

Plan your project in Canoga Park

Tell us about the property and what you have in mind. We reply with a written next step.