Structural Work in Woodland Hills When Opening Up Finds More

Hidden structural problems in Woodland Hills, like a post with no real footing or a deeply notched joist, found early, engineered and permitted by LADBS.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Pull up a section of floor in a Woodland Hills house and the post underneath may be resting on a loose block or bare soil, with no real footing at all. A finding like that changes the job. The engineer sizes a proper concrete pad, the permit drawings are revised, and the written scope gains a line you can see and approve before work continues. Nothing that should be fixed gets buried again.

What opening a floor or wall can show

Hidden conditions turn up once finishes come off. A joist notched deep for an old drain line loses much of its strength at the cut. A header over a widened doorway may be a single board where a doubled or engineered one was needed. Rafters can turn out to be spliced without proper fasteners. Fire, even a small one, can leave char behind a wall that looked clean from the room. Each discovery is photographed, measured and handed to the engineer, who decides whether the member is reinforced, sistered or replaced outright.

How a finding changes the paperwork

A structural change found partway through is never settled with a handshake. The engineer issues a revised detail or a short letter, and the revision goes to LADBS so the approved drawings match what is built. The written scope is updated with the added work and its cost, and you sign off before the change goes ahead. The inspector then checks the revised item with everything else. Keeping the record current matters later too, when someone reviewing the house asks what was done and whether it was permitted.

About our Structural Work serviceEverything we build in Woodland Hills

Structural Work in Woodland Hills: questions

Plan your project in Woodland Hills

Tell us about the property and what you have in mind. We reply with a written next step.