New Construction in Woodland Hills, Checking the Power Supply

New house construction in Woodland Hills that checks the electric service at the street first, since a larger load may need a new transformer or trench.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

The power line that fed an earlier house on a Woodland Hills lot can hide a limit. A new house with heat pumps, an induction range and a car charger may draw far more than the old service was sized for. LADWP reviews the load and decides whether the transformer serving the street can carry it. If it cannot, the answer may be a new transformer, a pad on the lot or a fresh underground run.

Finding the limit early

We start with the electrician's load calculation for the house as designed, including any future battery or solar. That figure goes to LADWP with a service application, and the utility's planner looks at the transformer, the line to the lot and the existing drop. Overhead service may be allowed to continue, or the utility may require an underground run in conduit. The answer arrives as a written design showing where the meter goes, the trench route and any equipment location. We place that information on the site plan before your designer fixes the garage or the driveway.

What a finding changes

If the transformer needs replacing, the utility may ask for space on the lot for a pad-mounted unit, possibly with an easement. That pad can move a driveway, a wall or a planter. An underground service needs a trench from the property line to the meter, sometimes shared with telephone and cable lines, and the trench route affects landscaping and footings near it. Each of these items sits on its own line in the estimate. LADBS inspects the meter equipment and the trench before backfill, and LADWP sets the meter once the city releases the service.

About our New Construction serviceEverything we build in Woodland Hills

New Construction in Woodland Hills: questions

Plan your project in Woodland Hills

Tell us about the property and what you have in mind. We reply with a written next step.