Decks & Patios in Woodland Hills

Woodland Hills decks and patios with rails built for hard sun: stainless cable between aluminum posts, sized footings, flashed ledgers and listed boards.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Rail finishes tire in strong sun long before the structure does. Stainless cable strung between aluminum posts gives a Woodland Hills deck a guard with no paint to chalk, no wood to check and a slim profile that keeps the yard in view. The cable is tensioned again after it settles, and the gaps stay inside the limit the code sets for openings.

Why metal on the rail

Wood rails split and fade where sun and dry wind work on them all day, and painted rails need recoating on a schedule. Powder-coated aluminum posts hold their color, and stainless cable neither rusts nor soaks up heat the way dark steel can. An open run also gives gusts nothing to push against, which a solid glass or board panel does not. Posts bolt through the rim joist with blocking behind, so a person leaning hard on the top cap finds a solid connection behind it.

What the cable asks of the frame

Tensioned cable pulls inward on the end posts, so those posts need heavier blocking and sometimes a diagonal brace, and the corner details are drawn out before the rail is ordered. Cable spacing is set so a 4 inch sphere cannot pass, and the tension is rechecked after a few weeks of temperature swings. Where the deck sits high, intermediate posts are added so the span between supports stays short and the cable does not sag. These choices cost nothing in looks and a great deal in how the guard behaves.

About our Decks & Patios serviceEverything we build in Woodland Hills

Decks & Patios in Woodland Hills: questions

Decks & Patios in other cities

What are you building in Woodland Hills?

Tell us about the property and what you have in mind. We reply with a written next step.