Decks & Patios in Valley Village

Valley Village decks and patios drawn for LADBS review: a clear site plan, footprint and clearances, sized footings, flashed ledger and listed boards.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

A deck drawing has to show the house it attaches to. For Valley Village, the LADBS reviewer wants the existing walls, the property lines, the new footprint and the distances between them on the site plan, since those lines settle whether the deck can be built where it is drawn. A site plan that is complete and to scale moves through review without a stack of questions.

The site plan comes first

Before the structure is detailed, the footprint is placed against the lot. The drawing shows how far the deck sits from each property line, where it meets the house, and where stairs land in the yard. Existing items that stay are drawn in too: a fence, a tree, a patio, a meter. If the deck is high enough or large enough to change a setback, we find that out at this stage, when moving a line on paper costs nothing. Stakes in the yard then confirm what the drawing says.

Then the structure behind it

Once the footprint is accepted, the sheets that follow carry the detail: footing size and depth, post and beam sizes, joist spans, the ledger attachment with its flashing and the guard and stair. Surface boards are named by product, and if wildfire mapping reaches the address the listing is attached. The reviewer can trace a single path from the boards down to the soil, and the inspector later walks the same path on site, checking each piece before it is covered.

About our Decks & Patios serviceEverything we build in Valley Village

Decks & Patios in Valley Village: questions

What are you building in Valley Village?

Tell us about the property and what you have in mind. We reply with a written next step.