Valley Village ADU Construction Around a Working Kitchen
Valley Village ADU construction on a cleared lot: a kitchen planned for daily cooking, LADBS review and inspection, and a unit that can house you first.
Cooking every night for months is the job we plan the kitchen of a Valley Village backyard unit around, since it may feed you and your family while the main house is rebuilt from the foundation up. It gets a deep sink, an electric range under a hood vented outdoors, and open counter on each side of the cooktop. A slim refrigerator saves floor space, and a pantry cabinet beside it makes up the storage.
Laying out a small kitchen that cooks
In a unit this size the kitchen shares a room with the living area, so we keep it to one wall or an L across two. The sink sits under a window where the plan allows, with the dishwasher next to it and the range a counter's width away, so two people can work without trading places. Upper cabinets leave room above for the hood duct. Counter outlets follow the code's spacing, each on a circuit protected against ground faults. Drawers below the counter hold more than doors do, which matters when the kitchen is also the pantry.
LADBS review and the kitchen rough-in
LADBS reads the drawings for what makes the unit a dwelling, and a fixed place to cook belongs on that list with a bathroom and a place to sleep. The range circuit, the hood duct route and the sink drain and vent are all drawn so the inspector can compare them in the field. Inspectors see the kitchen with the walls still open, when the plumbing and wiring are roughed in, and again at final. On that last visit the hood is switched on, the faucet runs and each counter outlet is tested.
About our ADU Construction serviceEverything we build in Valley Village
ADU Construction in Valley Village: questions
Building order is settled before the drawings. If the unit goes first, its foundation, framing and final can all land while the house is still in plan check, and moving in turns on LADBS approving occupancy of the unit alone. Every meal would be cooked in the small kitchen during that stretch, one more reason its counters and storage are sized for full-time use.
Capped at 500 square feet on a single level, a Valley Village design falls inside the package, once our visit confirms the footprint fits the lot. On this submittal the plan checker scales the kitchen and the bedroom off the floor plan, and the site plan gives the distance from the unit to each property line. Agency fees are billed by LADBS and quoted apart.
Some garages can. We probe the slab for thickness and an edge footing, and look over the studs and rafters for heat or termite damage. A kitchen inside a garage needs a new drain line, which means cutting a trench across the slab to reach the sewer, plus a heavier electrical feed. Those items are priced next to a new detached unit.
ADU Construction in other cities
More we build in Valley Village
Plan your project in Valley Village
Tell us about the property and what you have in mind. We reply with a written next step.

