Decks & Patios in Studio City

Studio City decks and patios built in a fixed order: footings poured and inspected, concrete cured, then framing, flashing and fire-listed surface boards.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Concrete cure time paces everything that follows on a Studio City deck. Footings are poured, inspected and left to cure before a beam rests on them, and everything after that waits on those days. Framing, hangers, flashing and the surface follow in a fixed order, which is why the drawings and the choice of boards are settled before the first hole is dug.

Footings and the pour

The yard is marked, utilities are located and the holes are dug to the depth the drawing calls for. An inspector sees each hole open, with the rebar set and the bottom clean, and only then does the concrete arrive. Post bases are set into the wet pour or bolted on after it hardens, depending on the detail. Weather and cure time decide how soon framing can start, so the schedule leaves room for it and no beam is set on concrete that is still green.

Framing outward from the house

Once the piers have gained strength, the ledger goes onto the wall with flashing tucked behind the siding or stucco. Next come posts, beams and joists, then hangers and bracing, and the framing is inspected before anything covers it. Last come the surface boards, the rail and the stair guard. Finish items such as lighting sleeves, a gas stub for a grill and a low-voltage run for stair lights are routed through the frame before decking, because reaching them afterward means taking boards up. The skirting or the open clearance beneath the frame is settled at this stage too.

About our Decks & Patios serviceEverything we build in Studio City

Decks & Patios in Studio City: questions

Decks & Patios in other cities

What are you building in Studio City?

Tell us about the property and what you have in mind. We reply with a written next step.