Decks & Patios in North Hollywood

North Hollywood decks and patios planned around what is underneath: slab voids, soil and buried lines found early so the drawing and quote hold up.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

A hollow ring from an old patio slab under a hammer can mean water has washed soil out from below. A dull thud suggests firm ground. In a North Hollywood yard that finding changes the plan: the slab comes out, the base is rebuilt in compacted layers, and the new patio or deck footings are drawn for what is actually underneath.

Listening to what is under the surface

Voids under a slab, a soft patch where a drain once leaked and fill that was never compacted all show up the same way, as movement or hollow sound. A probe rod and a small test hole tell us how deep the trouble goes. If the ground is weak, footings are drilled deeper to reach firm soil, or the engineer widens them to spread the load. If a slab is cracked but sound, it may stay as a base for pavers, which saves hauling and new concrete.

Lines and pipes in the way

A deck footing can land on a water line, a gas run or an irrigation main that has no marking at the surface. A utility locate is requested through 811 before any digging, and private lines to a garage or a shed are traced with a locator wand. When something turns up in the footing position, the post moves or the line is rerouted by the right trade, and the drawing is revised. A quote written after this step holds up because the surprises have already been found.

About our Decks & Patios serviceEverything we build in North Hollywood

Decks & Patios in North Hollywood: questions

Decks & Patios in other cities

What are you building in North Hollywood?

Tell us about the property and what you have in mind. We reply with a written next step.