Decks & Patios in Sherman Oaks

Sherman Oaks decks and patios drawn for LADBS review: guard spacing, stair details, footings and ledger attachment shown clearly before any boards are cut.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Open spacing in a guard gets measured on paper long before it is measured on site. For a Sherman Oaks deck, LADBS looks at how far apart the balusters sit, how high the top rail stands and how the posts tie into the framing. A rail that fails on the sheet comes back as a correction, which costs more time than drawing it right the first time.

Guards and stairs on the sheet

A guard has to stop a sphere 4 inches across from passing through any opening, and the top rail of a residential deck has to stand 36 inches high. The drawing shows both, along with a post attachment that resists a hard push from a person leaning on it. Stairs get the same treatment: even risers, a landing where the door opens, and a handrail a hand can wrap around. When these details are drawn out, the reviewer has nothing to guess at and the carpenter has a clear target.

Footings and the ledger

Behind the rail the reviewer reads the structure. Footing depth and width are tied to the soil bearing value, posts are sized for the height they carry, and the ledger is shown bolted to the house framing with flashing laid above and behind it. A deck standing 30 inches or more above grade draws extra attention to those connections. Hangers, bolts and post bases are named by type so the inspector can match them on site. Where a span or a load looks unusual, the engineer's calculation goes in the set.

About our Decks & Patios serviceEverything we build in Sherman Oaks

Decks & Patios in Sherman Oaks: questions

Decks & Patios in other cities

What are you building in Sherman Oaks?

Tell us about the property and what you have in mind. We reply with a written next step.