New Construction in Valley Village

A new Valley Village house with a home office built for full workdays: wired data, dedicated outlets, its own comfort zone and light that suits a screen.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Calls, screens and paperwork can fill a whole day in the home office of a new Valley Village house, so we design that room to handle them. It needs a wired connection that does not drop, outlets where the desk will stand, comfort with the door closed and daylight that stays off the monitor. We plan it with your designer while it is still lines on paper. LADBS reviews the permit set for the house.

Power, data and a steady connection

Wireless signals weaken through walls, so we run a data cable from a central closet to the desk wall, plus a ceiling point for an access point in the hall. The desk wall gets several outlets on a dedicated circuit at desk height, with a USB outlet if you want one. If you use a printer or a second monitor, we plan the cable route through a grommet in the desk so nothing trails across the floor. Each location is marked on the electrical sheets.

Comfort through a long day

An office with its door shut through a sunny afternoon can overheat when its single thermostat sits out in the hall. A separate zone, a ductless head or a return air path through a transfer grille keeps it comfortable with the door closed. A window placed to the side of the desk avoids glare on the screen and backlight on camera. For calls, soft surfaces and a rug cut the echo, and the shared walls can take sound insulation. Each choice shows on the plans before framing.

About our New Construction serviceEverything we build in Valley Village

New Construction in Valley Village: questions

Plan your project in Valley Village

Tell us about the property and what you have in mind. We reply with a written next step.