New Construction in Studio City, Step by Step

New house construction in Studio City that begins with utility shutoffs, temporary power and water, then grading, underground work and the foundation.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Nothing on a new Studio City house can start until the old services are shut off and the site has its own temporary power and water. Gas is capped at the meter, the old electrical drop is removed, and the sewer connection is plugged at the property line before demolition or grading begins. A temporary power pole and a hose bib then serve the crews. That order keeps the site safe and the inspector's first visit routine.

Shutting down, then setting up

The gas company caps the line and pulls the meter, and the electric utility removes its service from the old house. We document each disconnect before any machine arrives. A licensed plumber plugs the old sewer connection where the city requires it. Then the site gets what a build needs: a temporary power pole with its own permit and inspection, a water connection with a backflow device, a perimeter fence, erosion controls at the curb, and a portable toilet. Only after those are in place do demolition, grading and layout begin.

From layout to the first pour

The surveyor sets stakes at the corners of the new house and marks the finished floor height on a fixed point nearby. Grading brings the pad to the level the soils engineer approved, and that engineer observes the compaction and writes it up. Underground plumbing and conduit go into the trenches next, followed by a LADBS inspection of the pipes under test. Forms and reinforcing steel come after, and the foundation inspection closes before concrete is ordered. Each stage has a written checklist, and you receive it as the stage closes.

About our New Construction serviceEverything we build in Studio City

New Construction in Studio City: questions

Plan your project in Studio City

Tell us about the property and what you have in mind. We reply with a written next step.