Studio City ADU Construction, Planned From the Curb Back

Studio City ADU construction after a fire: trusses and beams lifted to the back of the cleared lot, LADBS plan check, and a build signed off stage by stage.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Roof trusses for a Studio City ADU arrive as long, stiff pieces that will not make the turn into a tight side yard. While the lot is still open after a fire, a boom truck at the curb can lift those trusses, the ridge beam and the drywall over the ground where the main house will stand and set them down beside the unit. We plan that lift, and the curb space it needs, before ordering the framing package.

Lifts, street space and loads carried on foot

A boom truck needs a firm, level spot at the curb, clear of trees and overhead wires, and its reach sets how far back a bundle can land. If the truck or a roll-off bin has to occupy part of the street, the city can require a separate permit for that, apart from the building permit, and we arrange it before delivery day. Smaller loads still go by hand: bagged mortar, boxes of fasteners, pipe, wire and fixtures. A foot path along one side of the lot, kept free of stacked material, carries those by cart, and it later becomes the path to the unit's door.

Plan review and inspections for the unit

Drawings for a Studio City ADU are reviewed by the Los Angeles Department of Building and Safety. Our site plan shows the unit, the outline of the planned house, the setbacks and the delivery path, so the reviewer sees how both buildings share the ground. Plan check corrections come back to us, and we revise the sheets and answer each note in writing until the permit issues. The first inspection then looks at the open footing trenches, and the last one clears the unit for occupancy. Between those inspections, each stage of the work is signed off before the next layer hides it.

About our ADU Construction serviceEverything we build in Studio City

ADU Construction in Studio City: questions

Plan your project in Studio City

Tell us about the property and what you have in mind. We reply with a written next step.