Room Additions and Second Stories in Studio City

Room additions and second stories in Studio City, built in a fixed order from a measured drawing of the house through engineering, permits and framing.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Design waits for a measured drawing of the house as it stands. On a Studio City addition that sheet comes first, ahead of the engineer, the permit and any digging, because every later drawing hangs from its dimensions. For owners starting from a cleared lot, the equivalent first step is a survey of the empty ground. Once that sheet exists, the stages follow one at a time.

Stages after the measured sheet

The engineer reviews the measured sheet and the foundation next, then the designer fits rooms to what the structure allows. The set goes to the building department. While review runs, we line up the order of trades: demolition at the connection point, footings, framing, roof, rough mechanicals, insulation, then finishes. The schedule shows each trade beside the inspection that must pass before the next one begins. Pulling any step forward risks covering up something an inspector still needs to see, so the list is followed in sequence.

Closing the house in

The roof opening is made late. New roof framing is built and sheathed, with underlayment staged, before the old roof is cut. That keeps the living space dry through the period when it would otherwise be open. Window and door openings in the old exterior wall are cut once the new walls around them stand. The final stage is the interior: drywall, flooring, trim and paint, finished room by room so you can move back into each space as it comes free.

About our Room Additions serviceEverything we build in Studio City

Room Additions in Studio City: questions

Room Additions in other cities

What are you building in Studio City?

Tell us about the property and what you have in mind. We reply with a written next step.