Decks & Patios with a Pacific Palisades Rebuild

Decks and patios drawn with a Pacific Palisades rebuild: fire-listed decking, engineered footings, a flashed ledger and paving that sheds water off the house.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Can we put the deck back where it was? The old footprint on a cleared Pacific Palisades lot is a useful start. The new deck is drawn with the house, to the code in force now. Parts of the area are mapped for fire hazard, and on those parcels the boards themselves have to meet ember rules, while what sits beneath the deck counts as much as the boards. Ledger height, stair landing and patio grade get set while the plans are open.

Under the boards

The frame that carries a deck deserves as much thought as its surface. Posts land on footings the engineer sizes for the load and the soil, and post bases keep end grain off the concrete. Joists hang in connectors rated for the treated lumber they touch, and on a lot close to the water those connectors and every screw come in stainless or a heavy zinc coat. Leaves and stored items under a deck give embers fuel, so the space below is either left open for easy cleanout or closed with noncombustible skirting and screened vents. Stairs get their own footings and a rail that meets guard height.

A patio graded away from the house

Ground at a new foundation should fall away from it, and a patio is the largest surface that either helps or fights that. The subgrade is cut and compacted, crushed rock is spread and tamped, and the concrete or pavers are set with a slight pitch toward a yard drain or open soil. Against a plastered wall the paving stays low enough to keep the weep screed clear. If you want shade, the engineer sizes the posts and footings for a cover, and where the lot falls in a mapped fire hazard area it is detailed for ember resistance, from roof panels to post wraps.

About our Decks & Patios serviceEverything we build in Pacific Palisades

Decks & Patios in Pacific Palisades: questions

Plan your project in Pacific Palisades

Tell us about the property and what you have in mind. We reply with a written next step.