Commercial Construction in Pacific Palisades

Slab and footing tests, a written scope, LADBS plan check and a shell built in inspected stages.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

"How much of the old foundation can we keep?" Asked at the first site visit to a burned storefront or office in Pacific Palisades, it gets an answer from the concrete itself. We drill cores from the slab, expose footings at a few corners, and pass the results to a structural engineer. The written scope then sorts each element into reuse or removal. Engineering, City of Los Angeles permits and a staged build under the current fire code follow in that order.

Plan check for a commercial building

LADBS handles plan check for commercial work in Pacific Palisades, and its reviewers go further than they would on a house. They confirm the occupancy group, count and size the exits, check fire-rated separations between different uses, and follow an accessible route from the public sidewalk through the entry to the restrooms. Fire and life safety items, such as sprinklers and alarms where the building needs them, go through a review of their own. If the parcel lies inside the Coastal Zone, coastal development review may come before the building permit. We check the drawings against this list before submission, so each item has an answer on the sheets before a reviewer asks.

From footings to a weathertight shell

After the permits issue, the work proceeds in inspected steps. Footings and the slab go first, followed by the structural frame, then roofing and exterior walls until the building is closed against the weather. Some parcels in Pacific Palisades are inside mapped fire hazard zones, and a commercial building on one of them needs ember-resistant construction: a Class A roof, vents that stop embers, noncombustible or ignition-resistant cladding and tempered glazing. If the lot sits near the shore, the specification calls for connectors and fasteners rated against corrosion. This phase ends with a sealed shell, ready for a tenant build-out or for the owner's own interior.

About our Commercial Construction serviceEverything we build in Pacific Palisades

Commercial Construction in Pacific Palisades: questions

Plan your project in Pacific Palisades

Tell us about the property and what you have in mind. We reply with a written next step.