Office & Retail Renovation in Pacific Palisades

Office and shop renovation in Pacific Palisades: smoke and water repair, odor sealing, phased work behind dust walls, LADBS permits and storefront glass.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

"Is the smell going to come back after we repaint?" Paint alone seldom ends it, because smoke settles into ceiling tiles, insulation, duct liners and carpet. In a Pacific Palisades office or shop hit by smoke from a nearby fire, our first visit samples those materials and opens a few test holes before any price is written. The repair then runs in a steady order: strip what is lost, clean and seal what remains, rebuild, and reopen.

Where smoke and water hide

Smoke residue travels into wall cavities, ductwork, the space above the ceiling grid and any porous surface, and water from firefighting can stay trapped behind drywall and under flooring. We take moisture readings across each room, mark the materials that must go, and open walls wherever the readings stay high. Ducts are cleaned or replaced. Framing that stays is cleaned and coated with an odor-sealing primer, and insulation, drywall and finishes go back only after the readings come down to dry. Each room gets its own entry in the written scope, which the business owner and the insurance adjuster can check against the work.

Keeping the doors open in phases

Work in an occupied office or shop is split into phases agreed before demolition. One zone closes behind sealed dust walls while customers and staff use the rest, and loud tasks can be scheduled outside business hours, within the city's permitted construction hours. Relocating walls or altering restrooms needs a permit from LADBS, and with it the accessibility items the code attaches to an alteration. Parts of Pacific Palisades lie inside mapped fire hazard zones, so a storefront change on such a parcel may need ember-resistant vents and glazing. A phase closes only after cleanup and any required inspection, and the next zone opens after that.

About our Office & Retail Renovation serviceEverything we build in Pacific Palisades

Office & Retail Renovation in Pacific Palisades: questions

Plan your project in Pacific Palisades

Tell us about the property and what you have in mind. We reply with a written next step.