Full Home Remodeling in Pacific Palisades
Whole-home remodeling in Pacific Palisades for houses still standing after a fire: smoke traced room by room, systems renewed, finishes rebuilt in order.
"Should we keep this house or start over from the foundation?" That is a fair thing to ask us on the first walk through a Pacific Palisades home that came through a fire with smoke and water inside. We answer it with evidence. We open a few wall and ceiling spots, check the framing behind them, note where soot and heat reached, and only then write a scope that covers every room and every trade in sequence.
Finding where the smoke went
Soot travels with moving air, so it collects in places nobody sees from the hallway: attic insulation, the hollow space inside walls, return ducts, the back of built-in cabinets. Our scope removes the materials that hold it, such as batts, drywall and carpet, and keeps sound wood framing, which is cleaned and coated with an odor-blocking sealer. Any joist or stud that shows charring goes to a structural engineer, who decides whether it is sistered, replaced or left. Since some Pacific Palisades parcels sit in a mapped fire hazard zone, an open exterior wall is also the moment to check vents, eaves and siding against the ember-resistance rules such a lot may face.
LADBS, the coastal zone and the sequence of trades
The permit for a remodel here is issued by LADBS, and its inspectors want to see rough electrical, plumbing and mechanical work before any insulation goes in. Some lots also sit within the coastal zone, which can bring a separate review, so we check the parcel before the design is settled. On site, each trade waits its turn: protection and demolition, structural repair, rough-in, insulation, drywall, then cabinets, floors, paint and fixtures. If you change your mind about a room midway, the change and its price go on paper and get your approval before work on it starts.
About our Full Home Remodeling serviceEverything we build in Pacific Palisades
Full Home Remodeling in Pacific Palisades: questions
Yes, provided the framing holds up to inspection. Once the interior is stripped, the studs and joists are cleaned, probed for char depth and sealed. Pieces the engineer rejects are replaced or reinforced. Because every stage of removal and repair is itemized, your adjuster can compare our scope line by line with the claim estimate.
Each stage closes with something you or an inspector can verify. Demolition ends when the frame is bare and clean. Structural repair ends with the engineer's review. Rough-in ends with the city's approval. Insulation and drywall follow, and finishes come last. The quote carries a price for each stage and each room, so any part of the total can be traced.
Start with whatever sat in the smoke path or near the heat: branch wiring, supply piping, drain lines, gas piping and ductwork, which can keep an odor long after the rooms are clean. With the walls open it is also simple to add circuits for an induction range or a heat pump, size the panel for them, and pull data cable for later.
More we build in Pacific Palisades
Plan your project in Pacific Palisades
Tell us about the property and what you have in mind. We reply with a written next step.

