Decks & Patios in Burbank

Deck and patio building in Burbank: tree roots and footings mapped first, ledger flashed to the house, boards chosen to the fire rules for the parcel.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Tree roots get mapped ahead of any pricing for a Burbank deck, with a tape run from each planned footing to each trunk close by. Roots travel well past the canopy edge, and a post hole that cuts a main root can leave a tree weaker and a deck on shaky ground. When a footing has to shift, the layout shifts with it, and the quote follows the final drawing.

Trunks, roots and the layout

Where a tree stands near the deck, we note the trunk size and how far the canopy reaches, then mark footing positions that stay clear of the heaviest roots. Digging by hand close to a tree lets us see what we hit, and a hole that finds a thick root gets moved before concrete arrives. A tree that drops fruit, sap or needles also changes the surface choice, since sticky debris shows on pale boards and settles into grooved ones. A dead or leaning trunk near the house is a matter for an arborist, and we say so early.

From measurements to a quote

Trunk distances, the height of the door threshold and the length of the house wall go onto a sketch that becomes the permit drawing. That drawing shows footing sizes, the ledger attachment and guard heights, the items an inspector checks on site. The written quote follows the same sketch, so anything that moves on the page moves in the price. Sample boards come along to the visit whenever the fire rules apply to the parcel, and the one you pick is confirmed against its listing.

About our Decks & Patios serviceEverything we build in Burbank

Decks & Patios in Burbank: questions

Decks & Patios in other cities

What are you building in Burbank?

Tell us about the property and what you have in mind. We reply with a written next step.