Structural Work in Burbank, From the Chimney Down
Chimney checks come first on Burbank structural jobs: masonry, roof framing and footings read after a fire, then repaired under a City of Burbank permit.
When a Burbank house has a masonry chimney, our flashlight goes there first, before any quote is written. Brick and mortar are heavy and rigid, and after a fire or a hard shake a chimney can crack where it passes through the roof or pull loose from the framing beside it. What turns up there can add bracing, or a teardown and a lighter framed chase, to a quote that would otherwise cover only the burned framing.
Reading a chimney from roof to footing
We look at the chimney from the roof, the attic and the ground. Up top, we check the mortar joints and the flashing where brick meets roofing. In the attic, we look for gaps between the chimney and the rafters beside it, and for char where framing sat too close to a flue that ran hot. At ground level, we look at the footing it stands on for cracks or tilt. A structural engineer then decides whether it can be strapped back to the roof framing, cut down near the roofline, or removed and replaced with a framed chase around a listed metal flue.
Closing the openings a chimney leaves
A chimney that comes down leaves holes in the roof, the ceiling and sometimes the floor, and each is framed closed with headers and new members tied into the existing structure. A chimney that stays may need steel straps fastened to blocking between the rafters, and a footing repair if it has settled. The rest of the frame gets the same close reading, from the sill plates to the ridge. Drawings for the chimney work and any framing repair go to the City of Burbank for its permit, and the straps, framing and new concrete stay exposed until a city inspector has seen them.
About our Structural Work serviceEverything we build in Burbank
Structural Work in Burbank: questions
Start with the heaviest parts of the house and what holds them up. A chimney, a girder under the middle of the floor and the posts beneath it all carry concentrated weight, so cracks, tilt or rot there matter most. We check those first, probe the sills and climb into the attic, and you get a written list sorted into sound, needs repair and worth watching.
Chimney work is a clear example. Bracing a chimney, or removing it and framing the openings it leaves, changes how the roof and ceiling carry load, so the City of Burbank will expect stamped details. The same reasoning covers any new beam or footing elsewhere in the house. Fixing one split rafter with a matching piece is usually ordinary carpentry.
The chimney comes first. An unreinforced masonry chimney can break and fall in a strong earthquake, so it is braced or replaced while the roof and attic are open. With the walls stripped, plywood panels and hold-downs go onto the studs and new anchor bolts tie the sill to the foundation, all drawn by the engineer on one permit set.
Structural Work in other cities
More we build in Burbank
Plan your project in Burbank
Tell us about the property and what you have in mind. We reply with a written next step.

