Commercial Construction in Burbank

Column spacing and clear height measured first, an engineer's read of fire damage, city plan check, staged inspections.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Two numbers get taped out first in a Burbank commercial building: the spacing between columns and the clear height under the roof structure. Together they decide what a shell can hold, from storefront bays to a mezzanine, and whether new roof framing can bear on the existing walls. Everything in the written scope hangs from those measurements, so they are taken on site and checked against any old drawing.

Reading a damaged shell

If fire reached the building, the structure is examined before any price is set. Steel is checked for warping and for lost fireproofing. Concrete is sounded and cored to learn how deep the heat went. Anchor bolts, column bases and the roof deck come next. An engineer reviews what turned up, and the scope states what stays, what is repaired and what is rebuilt, so the quote follows documented conditions from the first line to the last. Reports and photographs go into the file the permit set draws from.

City review and inspections

A Burbank commercial set goes to the city building department, where plan reviewers check accessibility, fire separation, exiting and the structural sheets against the code. We prepare the drawings with the engineer so the sheets agree with each other before submission. Corrections come back as written comments, and each is answered on the drawings. Inspections follow the build in stages: footings, framing, rough utilities and the final. A finished set also names the fire alarm and sprinkler scope, since those can come back as separate reviews.

About our Commercial Construction serviceEverything we build in Burbank

Commercial Construction in Burbank: questions

Commercial Construction in other cities

What are you building in Burbank?

Tell us about the property and what you have in mind. We reply with a written next step.