New Construction in West Hollywood, Measured From the Property Line

New house construction in West Hollywood priced after we locate neighboring walls and probe their footings, so the dig and its support are known early.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

The tape comes out at the property lines before we price a new West Hollywood house. If a neighbor's wall or foundation sits close to where our excavation will run, the gap and that footing's depth decide how the cut is dug and whether it needs temporary support. A wide gap may allow a simple sloped cut. A close wall changes the foundation budget, so we measure first and quote after.

Locating what stands beside the lot

Our survey request asks for more than boundary corners. We want the surveyor to locate walls, fences, eaves and foundations on the adjoining parcels wherever they come within reach of the planned dig. Where a neighbor's footing sits near the line, and with that owner's written consent, a small hand-dug test pit beside it shows how deep it goes and what it bears on. The soils engineer reads that pit together with the boring logs and states how steep an unsupported cut may stand. Those findings reach the structural engineer before any foundation sheet is drawn.

How the findings shape the estimate

With room to spare, the excavation can use sloped sides and no added support, which is the simplest path. A closer wall may call for soldier piles and lagging, set before the trench goes deep, and that adds engineering, equipment and days on site. If a neighbor's footing needs underpinning, a separate agreement with that owner comes first. The written estimate gives each path its own line. The City of West Hollywood building and safety division reviews the excavation support with the foundation plans, and its inspector looks at that support before footings are formed.

About our New Construction serviceEverything we build in West Hollywood

New Construction in West Hollywood: questions

Plan your project in West Hollywood

Tell us about the property and what you have in mind. We reply with a written next step.