North Hollywood Structural Work on Altered Roof Trusses
Cut truss webs and chords found during fire cleanup in North Hollywood, repaired to a written design and filed with LADBS as a permit revision.
Somewhere in the attic of a North Hollywood house, a roof truss may be missing a piece: a web cut out to fit a duct, a furnace or an attic ladder. Fire cleanup that strips the ceiling is often when that comes to light. A truss works only as a complete set of triangles, so a missing piece can leave the roof carrying weight on a frame never designed for it. That discovery moves the trusses to the front of the repair.
What an altered truss looks like
Signs of a cut truss are easy to miss in a dark attic. A web may be gone entirely, notched to let a duct pass, or replaced with a scrap board nailed at each end. A bottom chord may be cut through where an attic ladder was set in. Above a cut truss the roof can show a slight dip, and the ceiling under it may crack along the same line. After a fire, char along any member is traced too, since one weakened piece affects the whole truss. Every truss in the area is photographed and numbered.
Repair design and the LADBS revision
Truss repairs follow a written design from an engineer or the company that made the trusses, usually new lumber or plywood gussets fastened across the damage, or a new truss set alongside the old one. If the duct or ladder that caused the cut is staying, it is rerouted or reframed so the repaired truss stays whole. The design goes to LADBS, as a revision when a permit is already open, and the inspector sees the repair before the new ceiling covers it.
About our Structural Work serviceEverything we build in North Hollywood
Structural Work in North Hollywood: questions
Look up first, then down. In the attic, we check every truss or rafter for cuts, splits, char and loose joints, and sight along the roof for dips. In the rooms beneath, a level across the floors and a probe at the base of the walls finish the picture. A cut or cracked member anywhere in the roof is traced down to whatever carries it.
Any repair to a truss does, because a truss is an engineered product and only a design can restore it. Anything else that changes how the roof or floors carry weight goes to LADBS on stamped sheets as well. Swapping out one cracked board in a stick-framed roof may not.
The truss repair and the bracing can share one revision. With the ceiling and walls open, the engineer can add plywood panels and hold-downs where the walls need them and anchor bolts along the sill, so one set of drawings covers both jobs.
Structural Work in other cities
More we build in North Hollywood
Plan your project in North Hollywood
Tell us about the property and what you have in mind. We reply with a written next step.

