Stucco & Exterior Walls in North Hollywood

Stucco and exterior wall repair for North Hollywood houses, starting with a small cutout that shows how the lath and paper behind the plaster are holding up.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Cracks that keep returning after patches on a North Hollywood wall often point to loose lath, a fault no filler can fix. Lath nailed only into thin sheathing, or tied down with too few fasteners, lets plaster flex with every temperature swing and every slammed door. Finding it changes the job from a patch to a re-fastening or a partial re-lath, and a small cutout is how it is found.

How loose lath shows itself

A recoated crack that reopens along the same line is the first hint. Plaster that gives a drumlike sound when tapped is another. A cutout the width of a hand shows the fasteners: wire lath should be tied into studs at set intervals with galvanized nails, and staples shot into sheathing alone do not count. The paper behind may be brittle or missing too, since loose lath often comes with an old job done quickly. Whatever the cutout shows goes into the written scope with a photo.

What the finding changes

When the lath is sound but the plaster has let go, the repair stays small: cut back to firm material, patch in layers and match the finish. When the lath is loose over a large area, new fasteners go through into the studs, and sections that cannot be re-secured are replaced. If the paper behind is gone, the wall opens to the sheathing, new paper and flashing go on and lath follows. Each outcome carries a different scope, which is why the cutout comes before the quote.

About our Stucco & Exterior serviceEverything we build in North Hollywood

Stucco & Exterior in North Hollywood: questions

Stucco & Exterior in other cities

What are you building in North Hollywood?

Tell us about the property and what you have in mind. We reply with a written next step.