Decks & Patios in Altadena

Altadena decks and patios started at the footings: heat-tested old concrete, ember-resistant boards for mapped parcels, flashed ledgers, clear undersides.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Old deck piers left standing after a fire are the first thing we probe on an Altadena lot. Concrete that has seen intense heat can spall, crack or lose strength under a clean-looking surface, so we strike it, look for flaking and let the engineer decide whether a pier can carry new load. Some Altadena parcels are designated for wildfire, so replacement boards need a fire listing too.

Testing what is left in the ground

A hammer rings on sound concrete and thuds on damaged concrete. We check for color change, crumbling edges and exposed rebar, and the engineer may call for a core sample before anything old is reused. Bolts and post bases left in a pier are looked at as well, since heat weakens steel. Where a pier fails, it is removed and new footings are poured at the depth the soil calls for. Where it passes, reusing it can save digging, but only on the engineer's word.

A deck for a mapped parcel

A designated parcel calls for listed boards on the surface. Beneath them the frame stays open so debris can be raked out, or it is closed with noncombustible panels that have screened openings. Rails and posts are chosen to match, and stair treads and fascia boards follow the same listing. Because Altadena is an unincorporated community, plans go to the county for review, and the drawings name the listed products so the reviewer sees exactly what will be installed. Every hanger and fastener is hot-dip galvanized or stainless.

About our Decks & Patios serviceEverything we build in Altadena

Decks & Patios in Altadena: questions

Decks & Patios in other cities

What are you building in Altadena?

Tell us about the property and what you have in mind. We reply with a written next step.