Flooring, Drywall & Interior Finishes in Altadena

Flooring and drywall in Altadena, CA: soot and moisture tested room by room, then each wall and floor marked to clean, seal or remove before new work begins.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

A white cloth wiped along the top of a door casing is the first test in an Altadena house that sat near smoke. Soot settles on ledges nobody dusts, so a gray or oily streak on the cloth shows how far it traveled and whether it reached the back bedrooms. We repeat that wipe room by room, then hold a moisture meter to the base of each wall where water from the firefight may have soaked in.

Reading the cloth and the meter

A faint dusting that wipes off clean points toward washing and a sealing primer. A greasy streak that smears, or a sharp burnt smell when the cloth is held close, points to residue that has worked into the paper face of the drywall and the pores of the subfloor. High readings at the bottom of a wall mean the board has wicked water up from the floor. Each room gets a line on the written scope that says clean, seal or remove, with the cloth result and the meter reading noted beside it.

Floors once the walls are decided

Floors wait until the walls are settled, because pulling and hanging board drops dust and mud on everything below. Carpet and pad in a smoky room come out, since the fibers hold odor. Hardwood or engineered boards may be sanded, sealed and kept if the meter and the smell both pass. Under any flooring that is removed, the subfloor is wiped down, sealed where it carries odor and checked for flatness. Mapped fire hazard zones reach into parts of Altadena, and on those lots new exterior work has to meet ember-resistance rules, reviewed by Los Angeles County for this unincorporated community.

About our Flooring, Drywall & Interior Finishes serviceEverything we build in Altadena

Flooring, Drywall & Interior Finishes in Altadena: questions

Flooring, Drywall & Interior Finishes in other cities

What are you building in Altadena?

Tell us about the property and what you have in mind. We reply with a written next step.