Altadena ADU Construction, Starting With What Still Stands

Altadena ADU construction on a cleared lot: a standing chimney measured and made safe first, county plan check, old remnants removed and an inspected build.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

If a chimney still stands on a cleared Altadena lot, it is the first thing we measure. A masonry chimney left alone after a fire can lean, crack at its base or lose mortar to the heat, and it may sit close to where the ADU would go. We check its plumb with a level, look at the joints and the base, and mark a fall zone around it, so no one works inside that circle until it is braced or taken down.

What the county asks for

Altadena's ADU permits come from Los Angeles County Public Works, since the community is unincorporated. Taking down a chimney or other remnant can need its own county permit, and the site plan for the unit shows where the old house, its chimney and any surviving walls stood. Altadena parcels can carry a fire hazard severity rating, and on a rated lot the drawings follow the wildfire rules for roof, vents, siding and glazing. The fire department may look at access and water supply as well. If the lot slopes, a grading and drainage plan can join the set.

From cleared ground to a finished unit

Once the chimney is down, its footing is broken out, because a block of old concrete under a new slab settles differently from the soil around it. The hole is backfilled in lifts and compacted, and the soils engineer may test it before the unit's footing is formed. Old pipes that served the house are found, capped or reused after testing. The build then follows the county's inspection card, which lists footing, slab, framing, roof, rough trades, insulation and final, and each entry on that card is signed before work moves on.

About our ADU Construction serviceEverything we build in Altadena

ADU Construction in Altadena: questions

Plan your project in Altadena

Tell us about the property and what you have in mind. We reply with a written next step.