New Construction in Altadena, Starting From the Old Outline

An Altadena rebuild begins with a measured drawing of the house that burned, tied to the survey, so design and any insurance claim share one set of figures.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

You get a measured drawing of the Altadena house that burned before you see a price for the new one. We trace whatever the cleanup left, such as a slab edge, a stem wall or a capped pipe, record each wall run and room line, and tie the corners to the property survey. That drawing shows the size and layout that stood before the fire, so the new design and any insurance claim start from the same figures.

Finding the old outline

Slab edges and stem walls give the clearest line, and a laser level with a long tape turns them into a plan with room sizes. If the debris crew hauled the foundation away too, the outline comes from paper and photos: the county permit file for the old house, the assessor's record of its floor area and any pictures taken before the fire. Plumbing stubs, the sewer cleanout and the gas riser show where the kitchen, baths and meter stood. Each wall on the drawing is marked as measured on site or taken from a photo.

What the record changes

The old size and layout give the design a starting point. Setbacks, height and fire rules are checked as they read today, and a house that once sat close to a side line may need to shift or step in. Altadena includes land inside mapped fire hazard zones. On a parcel there, the roof, vents, siding, decks and glass may have to meet ember rules, and the county fire department may ask for a plan covering the planting near the house. Los Angeles County reviews the permit drawings. The measured record travels with them, so any question about what stood before has an answer on paper.

About our New Construction serviceEverything we build in Altadena

New Construction in Altadena: questions

Plan your project in Altadena

Tell us about the property and what you have in mind. We reply with a written next step.