ADU Construction in Encino, Measured From the Property Lines In

Encino ADU construction on a cleared fire lot: setbacks and soil checked first, permit drawings through LADBS, then a unit built and inspected stage by stage.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

A tape and the survey come out first on an Encino lot cleared after a fire. We measure from each side and rear property line to the spot where the ADU could sit, then to the outline of the planned main house. Those measurements show how large the unit can be, how far apart the buildings must stand, and whether the yard left over still works for both of them.

Setbacks, separation and the size of the unit

State law limits how much side and rear setback a city can require for a new ADU, so a unit may sit closer to a property line than the main house can. Walls near a line still need fire-rated construction and limits on openings, which shapes where windows go. Between the ADU and the main house, the building code asks for enough separation or for rated walls facing each other. We run those checks before design begins, so the unit starts from what the lot truly allows and nothing has to be redrawn after the first plan check comments.

Plan check and the build in Encino

LADBS is the agency for an Encino permit, and the paperwork that goes with it stays on our desk until the permit is granted. If debris removal disturbed the pad where the old house stood, a soils check before the footing pour tells us whether the ground needs compaction or deeper footings. Construction then follows a fixed order, with city inspections at the points listed on the permit card, and the main house later follows the same pattern under its own permit.

About our ADU Construction serviceEverything we build in Encino

ADU Construction in Encino: questions

Plan your project in Encino

Tell us about the property and what you have in mind. We reply with a written next step.