Valley Glen ADU Construction Placed to Pass Plan Check

Valley Glen ADU construction on a rebuild lot: setbacks, rated walls near a lot line and room kept for the new house, all checked by LADBS before a permit.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Distances are what an LADBS reviewer measures first on a Valley Glen ADU plan. With the house gone after a fire, there is nothing standing to measure from, so the site plan has to show the unit, the outline of the house to come and the gap from each wall to the property lines around it. State law lets a backyard unit sit as close as 4 feet to a side or rear line, and that choice shapes how its walls are built.

Walls that sit close to a property line

A wall less than 5 feet from a lot line falls inside the fire separation distance of the residential code. It is built as a 1-hour rated assembly, often with Type X gypsum on both faces, and its windows and doors are limited in size, with none allowed in the strip right against the line. Eaves reaching into that space need protected undersides too. Moving the unit a little further in frees up glass, and a cleared lot often has the room. We draw both positions so you can see which walls change and what each costs.

Room kept for the house that follows

The reviewer also looks at the unit beside the main house that will be built after it. Two buildings on one lot are measured as if an imaginary line ran between them, so the same rated wall rules can reach the facing walls when they stand close. We place the unit off the house design, even an early version, so neither building pushes the other into ratings it could avoid. Sewer and water routes for both go on the same sheet, with the path firefighters would take back to the unit marked from the curb.

About our ADU Construction serviceEverything we build in Valley Glen

ADU Construction in Valley Glen: questions

Plan your project in Valley Glen

Tell us about the property and what you have in mind. We reply with a written next step.