ADU Construction in Lake Balboa, Home Before the House Is Done

Lake Balboa ADU construction: can you move back onto the lot before the house is done? A permitted backyard unit, planned with the rebuild and LADBS review.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Can I move back onto my lot before the new house is finished? On a first walk of a Lake Balboa property that a fire has cleared, we answer by pacing out where a backyard unit could sit, where the utilities enter, and where the main house will go. If a permitted ADU can be built and given its final ahead of the house, it becomes your home through the rest of the rebuild, one stage at a time.

Placing the unit with the house in mind

The ADU and the new house share one parcel and can share one utility trench, so we locate them together. The unit stays clear of the house footprint, leaves room for a driveway and a delivery route, and turns its main windows away from where the larger walls will rise. Deep eaves and shaded glass on the exposed side keep a small inland unit comfortable through long sunny afternoons. All of this goes onto one site plan, which LADBS, the City of Los Angeles building department, reviews when the ADU application is filed.

What the written scope shows

The quote breaks the ADU into stages you can follow: excavation and slab, the frame and roof, plumbing and wiring roughed in, walls closed, then cabinets, tile and paint. Each stage carries its own inspection and its own line, so you can see what moves the number. Changes are written down before the work changes. When the unit goes first, the scope also lists the utility work sized for the house to come, so that cost sits where it belongs. The plans package sits on a line of its own, with the city's fees and the construction itself priced separately after we see the lot.

About our ADU Construction serviceEverything we build in Lake Balboa

ADU Construction in Lake Balboa: questions

Plan your project in Lake Balboa

Tell us about the property and what you have in mind. We reply with a written next step.