Structural Work in Sunland-Tujunga, Rebuilt Frame by Frame

Structural Work in Sunland-Tujunga: rebuilt frames with galvanized roof ties, treated sills and shear walls, engineered and inspected under an LADBS permit.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Galvanized steel ties at every rafter keep a roof fastened to its walls when hard, dry wind pushes on a house in mountain country. For an owner rebuilding in Sunland-Tujunga after a fire, choices like that are made at the frame stage, while every connection is still in view. Some of Sunland-Tujunga lies within mapped fire hazard areas, and a lot inside one can come with ember-resistance requirements for the siding and roof the frame will hold up.

Metal that holds the frame together

Wood framing relies on the metal joining it. Roof ties fasten rafters or trusses to the top plates, straps carry tension across floor levels, and hold-downs anchor the ends of shear walls into the foundation. The engineer specifies each one, and we install them with the nails or screws the maker calls for, since a hanger missing fasteners carries far less than its rated load. In a rebuild the whole set goes in at once, from footing anchors to roof ties, and the inspector checks the hardware before sheathing and insulation cover it.

Framed for the fire code that now applies

Structure and fire resistance meet at the exterior walls, eaves and roof. Where a lot falls inside a mapped hazard zone, the code may require ignition-resistant siding, enclosed eaves and vents built to resist embers, and the frame has to be ready to receive them. We settle those details with the designer before framing, so blocking, sheathing and roof framing match the assemblies going on. The plan check for the LADBS permit covers the structural set and the fire-resistance details, and we keep both in the written scope in the order they are built.

About our Structural Work serviceEverything we build in Sunland-Tujunga

Structural Work in Sunland-Tujunga: questions

Plan your project in Sunland-Tujunga

Tell us about the property and what you have in mind. We reply with a written next step.