Sun Valley Structural Work Above the Ceiling
Cut or heat-damaged roof trusses found above a Sun Valley ceiling during fire repairs, fixed to an engineered detail and added to the LADBS permit.
A roof truss with a web cut away to clear a duct or an attic hatch can sit above a Sun Valley ceiling for a long time with nobody aware of it. A fire repair can bring it to light, because charred drywall and wet insulation come down. That one cut means the truss no longer carries load the way it was designed to, so the engineer or the truss maker issues a repair detail, and we price it in writing first.
How a truss carries the roof
Each truss is a set of members working as one, with the top and bottom chords held apart by webs and joined by metal plates. Cut a single web, or bore through a chord, and the load that piece carried has nowhere to go, so the roof can sag and the ceiling below can crack. Heat can also loosen the metal plates where their teeth grip the wood. The repair is usually plywood gussets or added lumber fastened to a pattern the engineer draws, and sometimes a full replacement truss slid into place.
Pricing the change and the LADBS revision
A discovery like this gets its own written change, with photographs of the cut, the engineer's or manufacturer's detail and the added price, and work on that part of the roof waits for your approval. Other parts of the house can keep moving. If the repair alters the approved plans, the detail goes to LADBS as a revision to the Sun Valley permit. The inspector looks at the reinforced truss before insulation and drywall go back, and the change sits on the scope as a line of its own.
About our Structural Work serviceEverything we build in Sun Valley
Structural Work in Sun Valley: questions
The attic tells a lot after a fire. We follow each truss from wall to wall with a light, looking for cut webs, scorched or loose plates and sagging chords, then check the walls and floor framing near the damage. A list of defects with photos follows, sorted by which ones carry load.
A damaged or altered truss needs a repair designed by an engineer or the truss maker, and LADBS expects that detail with the Sun Valley permit. Changes to beams, posts, footings or bearing walls are engineered too. Hanging new drywall under a truss that checks out sound is finish work.
Roof-to-wall ties belong in the upgrade too. With ceilings down, the engineer can specify clips or straps fastening each truss to the wall below, along with plywood panels and hold-downs on walls already open. Sill anchors follow where the foundation can be reached. LADBS inspects the hardware before the ceiling closes.
Structural Work in other cities
More we build in Sun Valley
Plan your project in Sun Valley
Tell us about the property and what you have in mind. We reply with a written next step.

