Rebuilding in Sunland-Tujunga, Los Angeles County

Fire rebuild in Sunland-Tujunga

Sunland-Tujunga fire rebuild that gives windows and the wall around them close attention, as parts of the area sit in mapped fire hazard zones.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add what you are interested in, your first name and a phone number or an email.

Windows can be where a house first gives way to a wildfire, since radiant heat may crack ordinary glass and let embers inside. Fire hazard maps cover portions of Sunland-Tujunga, and any lot they include can be held to ember resistance rules, and in a mountain area dry wind can push burning debris far ahead of the flames. The rebuild plans therefore treat each window and the wall around it with care.

Glass and frames

Multipane units with at least one tempered pane hold together far longer under radiant heat than plain annealed glass, and the code for mapped zones accepts tempered multipane glazing among its options. Frames matter too. Metal and fiberglass keep their shape in heat that can soften some plastics, and vinyl frames can qualify when the corners are welded and the interlock is reinforced with metal. Each product's listing goes on the window schedule, so the plan checker can match what was specified to what the inspector later sees installed.

The wall around each opening

Siding beside a window is a second weak point, so the rebuild uses noncombustible or ignition resistant cladding, and the trim and flashing around each frame are metal or a rated product. Sealant joints are kept tight so embers have nowhere to lodge. Sunland-Tujunga is part of the City of Los Angeles, where LADBS reviews these exterior details on the plans and inspects them on site before they are covered. Decks or stairs that meet the wall near a window are drawn in the same rated materials, since burning wood below an opening can break the glass above it.

Start your Sunland-Tujunga project with a lot visit

Send the address and where things stand. We reply with the next step.