Structural Work in Pacoima, Posts Set Off the Concrete

Galvanized post bases hold wood above the concrete and anchor it against uplift. Pacoima fire repairs set each one to the engineer's layout, under LADBS.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

Where a post meets concrete in a fire rebuild in Pacoima, a galvanized steel base holds the wood a small gap above the surface. That gap keeps the end grain, which soaks up water readily, out of any puddle or damp patch, and the zinc coating protects the steel from both moisture and the chemicals in treated lumber. Bolted to the footing, the same base also keeps the post from lifting when an earthquake shakes the house.

Where post bases go

Porch and patio posts, posts under a raised floor and the posts that carry a beam in a garage all meet concrete somewhere. Each gets a base sized for its load and uplift, picked by the engineer and anchored into the footing, either cast in when the concrete is poured or set with epoxy into existing concrete. The posts themselves are pressure treated where they could get wet, and their hardware carries a coating rated for that wood. On an inland lot with irrigation near the house, those choices keep water away from the end grain.

LADBS inspection in Pacoima

Under the LADBS permit for this repair, anchors in new footings are inspected before concrete, then post bases, bolts and nailing before anything covers them. Epoxy-set anchors in old concrete can call for a special inspector as well. When a fire has taken part of the house, new framing is held to the code in force today, which can mean more bracing and hardware than the old frame had. Each base and anchor appears in the written scope by location, with its cost beside it.

About our Structural Work serviceEverything we build in Pacoima

Structural Work in Pacoima: questions

Plan your project in Pacoima

Tell us about the property and what you have in mind. We reply with a written next step.