New Construction in Sun Valley, Planned From the Sewer Line Up

Before a new Sun Valley house is drawn, a camera goes down the old sewer line. Its route, depth and condition decide where drains run and how floors sit.

Tell us about the lot

We read every request and reply about next steps for your property. Sending this commits you to nothing. How we use your details.

To send, add your first name and a phone number or an email.

The sewer line that served the old house usually stays in the ground after a Sun Valley lot is cleared, and its condition stays hidden until a camera goes down it. Roots, cracked joints or a sag that holds water can show on the screen, and heavy equipment on the lot may have crushed a section. What the camera finds changes the plans: a sound line can be reused, and a failed one is replaced and redrawn.

What the camera shows

A plumber feeds the camera in through the cleanout, or through the capped stub left when the house came down, and runs it out to where the line meets the main in the street. The recording shows the pipe material, each joint, any roots and any low spot where water stands. A locator on the camera head lets us mark the route and depth on the ground above, so the surveyor can add the line to the site map. Depth at the property line matters most, since it sets how low a drain inside the new house can sit and still flow downhill.

How the finding moves the design

A deep, sound line leaves the designer free to place bathrooms and the kitchen almost anywhere on the ground floor. A shallow one narrows the choices. The finished floor may have to rise, the lowest fixtures may move toward the street side of the house, or a sewage pump may be drawn in for a room that sits too low. A line that fails the camera test is replaced from the house to the connection, and the work in the street carries a separate city permit. Each of these decisions reaches the plumbing sheets before LADBS reviews them.

About our New Construction serviceEverything we build in Sun Valley

New Construction in Sun Valley: questions

Plan your project in Sun Valley

Tell us about the property and what you have in mind. We reply with a written next step.